The Equipment Maintenance Center was established in 1995, formerly known as the Equipment Maintenance Center of CNOOC North Drilling Company. In the past 30 years of development, it has completed 2 offshore modular drilling rig general contracting construction projects, including Chunxiao and Mexico PEMEX projects, 6 drilling platform and modular drilling rig equipment installation and commissioning projects, more than 130 drilling platform dock repair projects, initiated more than 240 offshore emergency repairs, and has the ability to synchronously dock repair 5 platforms. Its annual diesel engine repair capacity reaches 80 units, gradually developing into the largest professional equipment maintenance service team of CNOOC, and gradually expanding overseas. So far, the service targets involve multiple overseas projects such as Iraq, Mexico, Kuwait, Saudi Arabia, Indonesia, etc.
On September 16, 2022, the CNOOC Oil Well Control Equipment Maintenance Center was officially unveiled and established, providing one-stop services including daily maintenance, repair and testing, inspection and certification of imported and domestic related brand well control equipment.
In terms of BOP repair, our capability covers mainstream international and domestic brands, with an annual BOP repair capacity of over 400 units. After the new workshop is put into operation, we can achieve an annual repair volume of 700 units.
In terms of drilling equipment repair, we have the ability to repair drilling professional equipment on 5 platforms simultaneously, covering all drilling equipment on the entire ship, and serving customers both domestically and overseas.
In terms of diesel engine repair: with an annual repair volume of 80 units, we are a CAT deep cooperation general contracting maintenance service provider.
Regarding the repair of lifting devices: an annual repair volume of 100 sets.
In terms of rigging processing, it has a "Factory Accreditation Certificate" awarded by CCS, with processing capabilities covering the pressing and casting of single leg and multi leg rigging with diameters ranging from Ø 9.3mm to 65mm, and can achieve a tension test of 300-1200 tons of rigging.