Sand control completion

COSL Openhole Horizontal Well Gravel-Packing System allows the running, setting, testing, releasing, circulation, gravel packing, acid washing and tripping out of stringa. The designed string can maintain a pressure greater than that of formation in the horizontal wellbore, protecting the stability of openhole well, ensuring a smooth operation of the gravel packing .

Features:

COHP can be used for 9-5/8 "casing + 8-1/2" open hole, 7 "casing + 6" open hole;

COHP allows normal circulation and large torque to resolve the problem when large resistance is encountered;

The packer of COHP with larger inner diameter has reliable setting and hanging performance with a two-stage setting mechanism;

COHP can bear load to prevent pipe movement and ensure the optimal filling result during gravel-packing;

COHP keeps the well bore clean after pulling the service tool from the hole at the end of pack;

COHP can withstand 46MPa working pressure and 300℉(150℃) working temperature, which meets the requirement of fracturing-packing completion;

COHP can provide API P110, API N80, API 180-9cr, API 180-13cr tier materials to meet the requirements of different working environment.