Integrated Services |
Geophysics |
Geotechnical Surveying |
Drilling |
Drilling Rigs |
Module Drilling Rigs |
Tubing & Casing Running Services |
Oil Tools |
Equipment Support Services |
Directional Drilling |
Logging |
Drilling & Completion Fluids |
Water-based Drilling Fluid Systems |
Nonaqueous Drilling Fluid Systems |
Drill-in and Completion Fluid Systems |
Deep water test fluid |
Drilling and Completion Fluid Engineering Software |
Lost circulation prevention and plugging technology |
Drilling Fluid Equipment |
Drilling &Completion Fluids Additives |
Cementing |
Well Cementing Technology |
Well cementing casing accessory and tool |
Cementing simulation software system |
Well cementing chemicals |
Offshore cementing equipment |
Onshore cementing equipment |
Workover |
Production and Optimization |
Low-permeability Fracturing Service |
Service of Plugging Removal by Acidizing |
Heavy Oil Recovery Service |
EORService |
OilAndWaterTreatmentService |
Coiled Tubing and Nitrogen Services |
HYSY640 Stimulation Vessel and HYSY 696 Large Integrated Fracturing Vessel |
Geological&Reservoir |
Integrated G&R services |
Integrated Geology & Reservoir Analysis Technology |
Geology & Reservoir Analysis Technology for Heavy Oil Recovery |
Geology & Reservoir Analysis Technology for Enhanced Oil Recovery |
Well Completion |
Production Tools |
Ultra HPHT Completion Tools |
Sand control completion |
Screen |
Intelligent Completion |
Heavy oil thermal recovery completion tool |
CCUS/CCS Well Completion Technology |
Artificial lift |
The Completion Experiment and Testing Center |
Completion tool service |
Ground services |
Liftboats & Accommodation Rigs |
Marine Support Vessels |
Unconventional Resources |
Customer Appreciation |
Business World-wide |
EPS |
Water-based drilling fluid/cuttings reduction treatment technology |
Non-water based drilling fluid/cuttings reduction technology |
Well Completion Waste Treatment Technology |
Oily sludge treatment technology |
Cementing Engineering Technical Services |
retarder
medium and low temperature retarder
C-R22L is an organic phosphate retarder, which can prolong the thickening time of cement slurry. Suitable for use in medium and low temperature environments.
Low concentration sensitivity, Predictable thickening time, Suitable for mixing with fresh water and salt water, Especially effective for abnormal increase consistency of slurry while temperature rising
Applicable temperature BHCT < 100 ℃, organic phosphoric acid, used to solve the problem of cement heating and thickening in Xinjiang.
retarder
大温差高温缓凝剂
Large temperature difference high temperature retarder
R42L is a polymer retarder, which can prolong the thickening time of cement slurry. Suitable for use in medium and high temperature environments.
Features:
no side effect on the stability of the cement slurry; Slightly influence on strength development; Predictable thickening time; meet the requirements of top strength development under the condition of large temperature difference and long sealing.
120-180℃, suitable for cementing operation with large temperature difference, AMPS polymer.
China Oilfield Services Limited (COSL) is the leading integrated oilfield services providers in the Asian offshore market. COSL’s four main services divisions—Geophysical Services, Drilling Services, Well Services, and Marine and Transportation Services—cover the exploration, development, and production phases of the oil and gas industry.
2015 China Oilfield Services Limited All Rights Reserved Record Number: Tianjin ICP NO. 17008252